Route & Timings
| # | Station | Arrives | Departs | Platform | Day | Speed |
|---|---|---|---|---|---|---|
| 1 | Balharshah | 13:40 | 5 | 1 | 54.8 km/h | |
| 2 | Chandrapur | 13:55 | 13:57 | 2 | 1 | 84.5 km/h |
| 3 | Warora | 14:30 | 14:31 | 3 | 1 | 90 km/h |
| 4 | Hinganghat | 14:57 | 14:58 | 1 | 1 | 46.6 km/h |
| 5 | Wardha Jn | 15:41 | 15:43 | 2 | 1 | 84.9 km/h |
| 6 | Pulgaon Jn | 16:04 | 16:05 | 1 | 1 | 69.9 km/h |
| 7 | Dhamangaon | 16:22 | 16:23 | 1 | 1 | 24.1 km/h |
| 8 | Badnera Jn | 18:17 | 18:20 | 1 | 1 | 78.9 km/h |
| 9 | Akola Jn | 19:20 | 19:23 | 1 | 1 | 85.6 km/h |
| 10 | Shegaon | 19:49 | 19:50 | 1 | 1 | 95.5 km/h |
| 11 | Malkapur | 20:23 | 20:25 | 1 | 1 | 40 km/h |
| 12 | Bhusaval Jn | 21:40 | 21:45 | 4 | 1 | 64.8 km/h |
| 13 | Nasik Road | 01:43 | 01:45 | 3 | 2 | 50.6 km/h |
| 14 | Igatpuri | 02:45 | 02:50 | 4 | 2 | 53 km/h |
| 15 | Kalyan Jn | 04:22 | 04:25 | 5 | 2 | 33.9 km/h |
| 16 | Mumbai LTT | 05:30 | 2 | 2 | — |
Coach Position
ENG-SLRD-GEN-GEN-A1-B6-B5-B4-B3-B2-B1-S9-S8-S7-S6-S5-S4-S3-S2-S1-GEN-GEN-LPR
Rake Composition
23 coaches · ENG-SLRD-GEN-GEN-A1-B6-B5-B4-B3-B2-B1-S9-S8-S7-S6-S5-S4-S3-S2-S1-GEN-GEN-LPR
| Pos | Coach | Class | Type | Berths |
|---|---|---|---|---|
| 1 | ENG | ENG | — | — |
| 2 | SLRD | SLRD | — | — |
| 3 | GEN | GEN | — | — |
| 4 | GEN | GEN | — | — |
| 5 | A1 | A1 | — | — |
| 6 | B6 | B6 | — | — |
| 7 | B5 | B5 | — | — |
| 8 | B4 | B4 | — | — |
| 9 | B3 | B3 | — | — |
| 10 | B2 | B2 | — | — |
| 11 | B1 | B1 | — | — |
| 12 | S9 | S9 | — | — |
| 13 | S8 | S8 | — | — |
| 14 | S7 | S7 | — | — |
| 15 | S6 | S6 | — | — |
| 16 | S5 | S5 | — | — |
| 17 | S4 | S4 | — | — |
| 18 | S3 | S3 | — | — |
| 19 | S2 | S2 | — | — |
| 20 | S1 | S1 | — | — |
| 21 | GEN | GEN | — | — |
| 22 | GEN | GEN | — | — |
| 23 | LPR | LPR | — | — |
Seat Layouts
23 coachesBerth map per class — first cabin shown, pattern repeats.
AC 2-Tier
54 berths × 9 cabins
MAIN
LB
1
1
UB
2
2
LB
3
3
UB
4
4
SIDE
SL
5
5
SU
6
6
AC 3-Tier
72 berths × 9 cabins
MAIN
LB
1
1
MB
2
2
UB
3
3
LB
4
4
MB
5
5
UB
6
6
SIDE
SL
7
7
SU
8
8
Sleeper Class
80 berths × 10 cabins
MAIN
LB
1
1
MB
2
2
UB
3
3
LB
4
4
MB
5
5
UB
6
6
SIDE
SL
7
7
SU
8
8
Platform Coach Position
Punctuality
0% on-timeAVG ARRIVAL
+67m
AVG DEPARTURE
+65m
WORST STOP
Dhamangaon +109m
MOST DELAYED STOPS
BPQ Balharshah
arr +0m · dep +70m
CD Chandrapur
arr +66m · dep +72m
WRR Warora
arr +84m · dep +88m
HGT Hinganghat
arr +91m · dep +95m
WR Wardha Jn
arr +94m · dep +99m