PNR status
Lucknow Jn. InterCity SF Express #12180
Runs Mon Tue Wed Thu Fri Sat Sun
Informational only — no booking
Route & Timings
| # | Station | Arrives | Departs | Platform | Day | Speed |
|---|---|---|---|---|---|---|
| 1 | Agra Fort | 06:31 | 3 | 1 | 13.6 km/h | |
| 2 | Yamuna Bridge Jn | 06:42 | 06:43 | 2 | 1 | 45.6 km/h |
| 3 | Tundla Jn | 07:10 | 07:12 | 7 | 1 | 61.9 km/h |
| 4 | Firozabad | 07:28 | 07:29 | 2 | 1 | 85.7 km/h |
| 5 | Shikohabad Jn | 07:43 | 07:44 | 2 | 1 | 97.6 km/h |
| 6 | Etawah Jn | 08:18 | 08:20 | 3 | 1 | 79.6 km/h |
| 7 | Bharthana | 08:35 | 08:36 | 2 | 1 | 104 km/h |
| 8 | Phaphund | 08:57 | 08:58 | 2 | 1 | 79.6 km/h |
| 9 | Jhinjhak | 09:13 | 09:14 | 2 | 1 | 87.7 km/h |
| 10 | Rura | 09:27 | 09:28 | 2 | 1 | 94.3 km/h |
| 11 | Panki Dham | 09:49 | 09:50 | 1 | 1 | 13.6 km/h |
| 12 | Kanpur Central | 10:40 | 10:45 | 9 | 1 | 33.9 km/h |
| 13 | Unnao Jn | 11:16 | 11:18 | 3 | 1 | 48.6 km/h |
| 14 | Lucknow Junction | 12:25 | 2 | 1 | — |
Coach Position
ENG-SLRD-GEN-GEN-D1-D2-D3-D4-D5-D6-D7-D8-C1-C2-B1-GEN-GEN-LPR
Rake Composition
18 coaches · ENG-SLRD-GEN-GEN-D1-D2-D3-D4-D5-D6-D7-D8-C1-C2-B1-GEN-GEN-LPR
| Pos | Coach | Class | Type | Berths |
|---|---|---|---|---|
| 1 | ENG | ENG | — | — |
| 2 | SLRD | SLRD | — | — |
| 3 | GEN | GEN | — | — |
| 4 | GEN | GEN | — | — |
| 5 | D1 | D1 | — | — |
| 6 | D2 | D2 | — | — |
| 7 | D3 | D3 | — | — |
| 8 | D4 | D4 | — | — |
| 9 | D5 | D5 | — | — |
| 10 | D6 | D6 | — | — |
| 11 | D7 | D7 | — | — |
| 12 | D8 | D8 | — | — |
| 13 | C1 | C1 | — | — |
| 14 | C2 | C2 | — | — |
| 15 | B1 | B1 | — | — |
| 16 | GEN | GEN | — | — |
| 17 | GEN | GEN | — | — |
| 18 | LPR | LPR | — | — |
Seat Layouts
18 coachesBerth map per class — first cabin shown, pattern repeats.
Second Seating
108 berths × 18 cabins
MAIN
WS
1
1
MS
2
2
AS
3
3
SIDE
AS
4
4
MS
5
5
WS
6
6
AC Chair Car
78 berths × 16 cabins
MAIN
WS
1
1
MS
2
2
AS
3
3
SIDE
AS
4
4
WS
5
5
AC 3-Tier
72 berths × 9 cabins
MAIN
LB
1
1
MB
2
2
UB
3
3
LB
4
4
MB
5
5
UB
6
6
SIDE
SL
7
7
SU
8
8
Platform Coach Position
Punctuality
57.1% on-timeAVG ARRIVAL
+11m
AVG DEPARTURE
+15m
WORST STOP
Panki Dham +38m
MOST DELAYED STOPS
ETW Etawah Jn
arr +16m · dep +19m
BNT Bharthana
arr +17m · dep +20m
PHD Phaphund
arr +20m · dep +25m
JJK Jhinjhak
arr +24m · dep +27m
RURA Rura
arr +28m · dep +31m