Route & Timings
| # | Station | Arrives | Departs | Platform | Day | Speed |
|---|---|---|---|---|---|---|
| 1 | Buxar | 11:55 | 3 | 1 | 91.3 km/h | |
| 2 | Ara | 12:40 | 12:42 | 1 | 1 | 50.8 km/h |
| 3 | Patna Jn | 13:40 | 13:50 | 2 | 1 | 46.9 km/h |
| 4 | Fatuha | 14:18 | 14:20 | 2 | 1 | 35.7 km/h |
| 5 | Bihar Sharif | 15:40 | 15:42 | 1 | 1 | 55.2 km/h |
| 6 | Rajgir | 16:08 | 16:10 | 2 | 1 | 43.8 km/h |
| 7 | Tilaya | 17:13 | 17:15 | 1 | 1 | 51.4 km/h |
| 8 | Koderma | 19:18 | 19:20 | 4 | 1 | 74.8 km/h |
| 9 | Nsc Bose J Gomo | 20:35 | 20:40 | 2 | 1 | 44.3 km/h |
| 10 | Chandrapura | 21:03 | 21:05 | 1 | 1 | 30.8 km/h |
| 11 | Bokaro Steel City | 21:35 | 21:40 | 2 | 1 | 60.9 km/h |
| 12 | Kotshila | 22:08 | 22:10 | 2 | 1 | 200 km/h |
| 13 | Jhalida | 22:13 | 22:15 | 2 | 1 | 41.3 km/h |
| 14 | Muri Jn | 22:33 | 22:35 | 3 | 1 | 67.7 km/h |
| 15 | Chandil Jn | 23:35 | 23:37 | 4 | 1 | 107.3 km/h |
| 16 | Kandra | 23:45 | 23:50 | 3 | 1 | 27.6 km/h |
| 17 | Tatanagar Jn | 00:35 | 1 | 2 | — |
Coach Position
ENG-SLRD-GEN-S14-S13-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-B2-B1-GEN-SLRD
Rake Composition
21 coaches · ENG-SLRD-GEN-S14-S13-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-B2-B1-GEN-SLRD
| Pos | Coach | Class | Type | Berths |
|---|---|---|---|---|
| 1 | ENG | ENG | — | — |
| 2 | SLRD | SLRD | — | — |
| 3 | GEN | GEN | — | — |
| 4 | S14 | S14 | — | — |
| 5 | S13 | S13 | — | — |
| 6 | S12 | S12 | — | — |
| 7 | S11 | S11 | — | — |
| 8 | S10 | S10 | — | — |
| 9 | S9 | S9 | — | — |
| 10 | S8 | S8 | — | — |
| 11 | S7 | S7 | — | — |
| 12 | S6 | S6 | — | — |
| 13 | S5 | S5 | — | — |
| 14 | S4 | S4 | — | — |
| 15 | S3 | S3 | — | — |
| 16 | S2 | S2 | — | — |
| 17 | S1 | S1 | — | — |
| 18 | B2 | B2 | — | — |
| 19 | B1 | B1 | — | — |
| 20 | GEN | GEN | — | — |
| 21 | SLRD | SLRD | — | — |
Seat Layouts
21 coachesBerth map per class — first cabin shown, pattern repeats.
Sleeper Class
80 berths × 10 cabins
MAIN
LB
1
1
MB
2
2
UB
3
3
LB
4
4
MB
5
5
UB
6
6
SIDE
SL
7
7
SU
8
8
AC 3-Tier
72 berths × 9 cabins
MAIN
LB
1
1
MB
2
2
UB
3
3
LB
4
4
MB
5
5
UB
6
6
SIDE
SL
7
7
SU
8
8
Platform Coach Position
Punctuality
0% on-timeAVG ARRIVAL
+407m
AVG DEPARTURE
+391m
WORST STOP
Tatanagar Jn +569m
MOST DELAYED STOPS
BXR Buxar
arr +0m · dep +174m
ARA Ara
arr +234m · dep +240m
PNBE Patna Jn
arr +300m · dep +304m
FUT Fatuha
arr +316m · dep +328m
BEHS Bihar Sharif
arr +344m · dep +350m