Route & Timings
| # | Station | Arrives | Departs | Platform | Day | Speed |
|---|---|---|---|---|---|---|
| 1 | Darbhanga Jn | 00:30 | 1 | 32.1 km/h | ||
| 2 | Samastipur Jn | 01:40 | 01:45 | 1 | 46.8 km/h | |
| 3 | Barauni Jn | 02:50 | 03:00 | 1 | 33.7 km/h | |
| 4 | Kiul Jn | 04:10 | 04:12 | 5 | 1 | 41 km/h |
| 5 | Jhajha | 05:30 | 05:35 | 2 | 1 | 55.1 km/h |
| 6 | Jasidih Jn | 06:23 | 06:25 | 1 | 69.6 km/h | |
| 7 | Madhupur Jn | 06:50 | 06:52 | 1 | 84.6 km/h | |
| 8 | Chittaranjan | 07:32 | 07:34 | 2 | 1 | 36.9 km/h |
| 9 | Asansol Jn | 08:15 | 08:20 | 5 | 1 | 79.3 km/h |
| 10 | Durgapur | 08:52 | 08:54 | 1 | 49.1 km/h | |
| 11 | Bardhaman | 10:12 | 10:15 | 1 | 84.1 km/h | |
| 12 | Dankuni | 11:12 | 11:15 | 1 | 4.7 km/h | |
| 13 | Santragachi Jn | 14:08 | 14:10 | 1 | 15.3 km/h | |
| 14 | Shalimar | 14:30 | 1 | — |
Coach Position
ENG-SLRD-GEN-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-B3-B2-B1-A3-A2-A1-GEN-GEN-SLRD
Rake Composition
24 coaches · ENG-SLRD-GEN-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-B3-B2-B1-A3-A2-A1-GEN-GEN-SLRD
| Pos | Coach | Class | Type | Berths |
|---|---|---|---|---|
| 1 | ENG | ENG | — | — |
| 2 | SLRD | SLRD | — | — |
| 3 | GEN | GEN | — | — |
| 4 | S12 | S12 | — | — |
| 5 | S11 | S11 | — | — |
| 6 | S10 | S10 | — | — |
| 7 | S9 | S9 | — | — |
| 8 | S8 | S8 | — | — |
| 9 | S7 | S7 | — | — |
| 10 | S6 | S6 | — | — |
| 11 | S5 | S5 | — | — |
| 12 | S4 | S4 | — | — |
| 13 | S3 | S3 | — | — |
| 14 | S2 | S2 | — | — |
| 15 | S1 | S1 | — | — |
| 16 | B3 | B3 | — | — |
| 17 | B2 | B2 | — | — |
| 18 | B1 | B1 | — | — |
| 19 | A3 | A3 | — | — |
| 20 | A2 | A2 | — | — |
| 21 | A1 | A1 | — | — |
| 22 | GEN | GEN | — | — |
| 23 | GEN | GEN | — | — |
| 24 | SLRD | SLRD | — | — |
Seat Layouts
24 coachesBerth map per class — first cabin shown, pattern repeats.
Sleeper Class
80 berths × 10 cabins
MAIN
LB
1
1
MB
2
2
UB
3
3
LB
4
4
MB
5
5
UB
6
6
SIDE
SL
7
7
SU
8
8
AC 3-Tier
72 berths × 9 cabins
MAIN
LB
1
1
MB
2
2
UB
3
3
LB
4
4
MB
5
5
UB
6
6
SIDE
SL
7
7
SU
8
8
AC 2-Tier
54 berths × 9 cabins
MAIN
LB
1
1
UB
2
2
LB
3
3
UB
4
4
SIDE
SL
5
5
SU
6
6
Platform Coach Position
Punctuality
0% on-timeAVG ARRIVAL
+249m
AVG DEPARTURE
+220m
WORST STOP
Dankuni +346m
MOST DELAYED STOPS
DBG Darbhanga Jn
arr +0m · dep +189m
SPJ Samastipur Jn
arr +198m · dep +209m
BJU Barauni Jn
arr +213m · dep +86m
KIUL Kiul Jn
arr +299m · dep +303m
JAJ Jhajha
arr +275m · dep +280m